![]() 'counter of how many equations we have run Here is the code I am using (the data attached):Ĭode: Select all 'create empty equation to be used inside the loop Can it be because I am using EViews via Jukebox, an app that my Uni supplies so everyone has a remote access to all programs purchased by the Uni? Also I have a Mac at home and I am using Parallels Desktop for Windows, while at Uni it is Windows 10 PC.Ĭan I somehow fix this? What happens if I increase the tolerance for errors? Now the program stops if one error comes up. ![]() I've got "!TODAY is not defined" message on stocks pair number 126, after around 6 minutes. It just go through the 307th or 308th pair of stocks just fine until it breaks again in 15 minutes time or on the next 600th correlation or so. It also works if I restart the loop from say a pair combination number 290. However, once I increased the code to 50 stocks both runs it stopped on the correlation 307 or 308 or in about 15 minutes. It works fine for say 5-10 stocks (I started with 3 stocks and then increased it to 5 and then 10 all is estimated fine). One message was saying something like "!TODAY is not defined" and the second one was "%TYPE is invalid". I've noticed that after 15 minutes of running a program file in the quiet mode Eviews shows an error message. ![]() ![]() I am trying to run a program with a large number of loops in Eviews 9.5. I have a different problem with the add-in. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |